---
title: "Chamberlain Student Center | Rowan University – Keast & Hood"
url: https://keasthood.com/portfolio-item/chamberlain-student-center-rowan-university
description: "Chamberlain Student Center | Rowan University 2025 SEAoP Award Winner Originally built in 1974 to serve a much smaller student population, the Chamberlain Student Center has long been the heart of Rowan University’s Glassboro campus - a hub for student life, e"
lang: en
---

# Chamberlain Student Center | Rowan University

Image: Chamberlain Student Center | Rowan University (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/2534f0d2a744340945750f7172834065-2024-09-251027_061.jpg)

**2025 SEAoP Award Winner**

Originally built in 1974 to serve a much smaller student population, the Chamberlain Student Center has long been the heart of Rowan University’s Glassboro campus - a hub for student life, events, and community engagement. As the student body grew, so did the need for a more expansive and modern facility.

Completed in March 2025, the award-winning expansion responds to this growth by providing a dynamic, multifunctional addition that supports meetings, programming, campus services, and large-scale events. Designed around the concept of a traditional Greek “agora” - an open space for dialogue and community - the structure fosters collaboration through open, light-filled interiors and inviting public spaces.

Structural highlights include a full-height curtainwall system framed by a striking exterior colonnade, a new outdoor plaza and terrace, and an interior amphitheater. The roof features exposed glulam beams and cross-laminated timber (CLT) panels, uniting aesthetics and sustainability in one of the university’s most forward-thinking spaces.

Principal

Constantine G. Doukakis, PE (retired)

Project Team

Alexander J. Stadel, PE | Jason M. DeMuro, PE

Client

ikon.5 architects

Location

Glassboro, NJ

Project Type

Academic

Project Scope

Addition

Status

Complete: 2023

Cost

$30 Million

Image: Chamberlain Student Center | Rowan University (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/53e1dec9f5607d8c111bb12080dd3788-2024-09-251027_0116.jpg)

Image: Chamberlain Student Center | Rowan University (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/d518d4c5ffe6a75d71ef8b9a2d587579-2024-09-251027_169540.jpg)

All Projects: https://keasthood.com/projects

## Structured data

```json
{
  "@context": "https://schema.org",
  "@type": "CreativeWork",
  "name": "Chamberlain Student Center | Rowan University",
  "url": "https://keast-hood.itigniter.com/portfolio-item/chamberlain-student-center-rowan-university",
  "description": "Chamberlain Student Center | Rowan University 2025 SEAoP Award Winner Originally built in 1974 to serve a much smaller student population, the Chamberlain Student Center has long been the heart of Rowan University’s Glassboro campus - a hub for student life, e",
  "image": "https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/2534f0d2a744340945750f7172834065-2024-09-251027_061.jpg",
  "creator": {
    "@type": "Organization",
    "name": "Keast & Hood"
  }
}
```