---
title: "Athletic Complex | George School – Keast &amp; Hood"
description: "Athletic Complex | George School | Newtown, PA Keast &amp; Hood provided structural engineering for a new 100,000-sf athletic complex designed to serve physical fitness needs for 500+ students at the private Quaker day and boarding school. The structural solution"
lang: en
json-ld: |
  {
    "@context": "https://schema.org",
    "@type": "CreativeWork",
    "name": "Athletic Complex | George School",
    "url": "https://keast-hood.itigniter.com/portfolio-item/athletic-complex-george-school",
    "description": "Athletic Complex | George School | Newtown, PA Keast & Hood provided structural engineering for a new 100,000-sf athletic complex designed to serve physical fitness needs for 500+ students at the private Quaker day and boarding school. The structural solution",
    "image": "https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-01alt-small.jpg",
    "creator": {
      "@type": "Organization",
      "name": "Keast & Hood"
    }
  }
---

[![Keast & Hood Structural Engineers](https://keast-hood.itigniter.com/__l5e/assets-v1/63f6ea4d-7417-4ea8-ae63-b974b4bc82b0/kh-logo-blue.svg)](/)

[Home](/)

[Expertise](/our-services)

[New Construction Efficient, elegant structural systems for ambitious new buildings. ](/our-services/new-construction)[Historic Preservation Careful intervention that keeps landmark buildings standing and in use. ](/our-services/historic-preservation)[Renovations | Additions | Adaptive Reuse Renovations, additions and adaptive reuse that unlock existing structures. ](/our-services/renovation)[Building Envelope Facade, roof and waterproofing assessment for durable enclosures. ](/our-services/building-envelope)[Structural Investigation | Intervention Investigation, testing and repair strategies for troubled structures. ](/our-services/structural_investigation_intervention)[Sustainability Low-carbon structural design guided by our SE2050 commitment. ](/our-services/sustainability)

### 70 years of structural expertise

From landmark preservation to net-zero new construction, see how our engineering shapes each project.

[View all projects](/projects)

[Projects](/projects)

[About Us](/aboutus)

[People Meet the engineers behind the work. ](/aboutus/people)[Legacy Seven decades of landmark projects. ](/aboutus/legacy)[News + Articles Firm news, awards and insights. ](/category/news)[Social Feed The latest from our studio. ](/social-feed)

### Join our team

We are always looking for curious engineers who love buildings.

[See open roles](/careers)

[Careers](/careers)

[Contact](/contact-us)

# Athletic Complex | George School

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-01alt-small.jpg)

Keast & Hood provided structural engineering for a new 100,000-sf athletic complex designed to serve physical fitness needs for 500+ students at the private Quaker day and boarding school.

The structural solution uses structural steel framing, long-span open-web steel joists, and CMU infill walls with brick masonry. Structural design was completed using Revit for integration and clash detection among disciplines.

Amenities of the $25 million complex include a 4,200-sf fitness center; natatorium with a 25-foot, eight-lane pool and seating for 100; 12,600-sf performance gym with two courts and seating for 400; field house with two training courts; wrestling room with two mats; locker room with 600 lockers; yoga studio; training facilities; classrooms; conference room; and offices. 

The project was designed to LEED standards, with certification pending. Sustainable features include a green roof with solar hot water collectors and an expansive use of glass for natural light within the building. 

Principal

Constantine G. Doukakis, PE (retired)

Project Team

Alexander J. Stadel, PE | Robert W. Boris, PE

Client

Bowie Gridley Architects

Location

Newtown, PA

Project Type

Primary and Secondary Education

Project Scope

New Construction

Status

Complete: 2014

Cost

$25 Million

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-11Salt-small.jpg)

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-06S-small.jpg)

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-10-small.jpg)

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-07S-small.jpg)

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-08-small.jpg)

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-02S-small.jpg)

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-09S-small.jpg)

![Athletic Complex | George School](https://keast-hood.itigniter.com/media/imported/2024-11-GeorgeSchool-05alt-small.jpg)

[All Projects](/projects)

![Keast & Hood Structural Engineers](https://keast-hood.itigniter.com/__l5e/assets-v1/80bc79b1-0211-4ea5-8b9b-47b698c8eca0/kh-logo-reverse.svg)

A certified Women's Business Enterprise (WBE), Small Business Enterprise (SBE), and Disadvantaged Business Enterprise (DBE) delivering structural engineering solutions for over 70 years.

[](https://www.linkedin.com/company/keast-&-hood/)[](https://www.instagram.com/keastandhood/)

## Expertise

-   [New Construction](/our-services/new-construction)
-   [Historic Preservation](/our-services/historic-preservation)
-   [Renovations | Additions | Adaptive Reuse](/our-services/renovation)
-   [Building Envelope](/our-services/building-envelope)
-   [Structural Investigation | Intervention](/our-services/structural_investigation_intervention)
-   [Sustainability](/our-services/sustainability)

## Philadelphia

1635 Market Street, Suite 1705

Philadelphia, PA 19103

[(215) 625-0099](tel:2156250099)[mail@keasthood.com](mailto:mail@keasthood.com)

-   [Careers](/careers)
-   [News + Articles](/category/news)

© 2026 Keast & Hood Structural Engineers. All rights reserved.

[Sitemap](/sitemap.xml)