---
title: "Athletic Complex | George School – Keast & Hood"
url: https://keasthood.com/portfolio-item/athletic-complex-george-school
description: "Athletic Complex | George School | Newtown, PA Keast & Hood provided structural engineering for a new 100,000-sf athletic complex designed to serve physical fitness needs for 500+ students at the private Quaker day and boarding school. The structural solution"
lang: en
---

# Athletic Complex | George School

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/0ea6ef271844d4686a002e36969884b4-2024-11-GeorgeSchool-01alt-small.jpg)

Keast & Hood provided structural engineering for a new 100,000-sf athletic complex designed to serve physical fitness needs for 500+ students at the private Quaker day and boarding school.

The structural solution uses structural steel framing, long-span open-web steel joists, and CMU infill walls with brick masonry. Structural design was completed using Revit for integration and clash detection among disciplines.

Amenities of the $25 million complex include a 4,200-sf fitness center; natatorium with a 25-foot, eight-lane pool and seating for 100; 12,600-sf performance gym with two courts and seating for 400; field house with two training courts; wrestling room with two mats; locker room with 600 lockers; yoga studio; training facilities; classrooms; conference room; and offices.

The project was designed to LEED standards, with certification pending. Sustainable features include a green roof with solar hot water collectors and an expansive use of glass for natural light within the building.

Principal

Constantine G. Doukakis, PE (retired)

Project Team

Alexander J. Stadel, PE | Robert W. Boris, PE

Client

Bowie Gridley Architects

Location

Newtown, PA

Project Type

Primary and Secondary Education

Project Scope

New Construction

Status

Complete: 2014

Cost

$25 Million

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/0ab1dd92bd912bbd62e6dc9f69db55e7-2024-11-GeorgeSchool-11Salt-small.jpg)

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/74f3a09d5d49e6e9e2b5185eb861ce96-2024-11-GeorgeSchool-06S-small.jpg)

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/7c013d792525918f7e5b0caf63531659-2024-11-GeorgeSchool-10-small.jpg)

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/fdfdaa7928b7b47b28fd09197eb7cb45-2024-11-GeorgeSchool-07S-small.jpg)

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/2908597d88d77f9caec634ca4bded081-2024-11-GeorgeSchool-08-small.jpg)

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/cbf056f5fa155b6e62f5dfb470ae61e6-2024-11-GeorgeSchool-02S-small.jpg)

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/e23588acccda8571aa89365751f6487e-2024-11-GeorgeSchool-09S-small.jpg)

Image: Athletic Complex | George School (https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/d8c73396df1ead42e48836fa9cb18f45-2024-11-GeorgeSchool-05alt-small.jpg)

All Projects: https://keasthood.com/projects

## Structured data

```json
{
  "@context": "https://schema.org",
  "@type": "CreativeWork",
  "name": "Athletic Complex | George School",
  "url": "https://keast-hood.itigniter.com/portfolio-item/athletic-complex-george-school",
  "description": "Athletic Complex | George School | Newtown, PA Keast & Hood provided structural engineering for a new 100,000-sf athletic complex designed to serve physical fitness needs for 500+ students at the private Quaker day and boarding school. The structural solution",
  "image": "https://ignitersaas.com/objects/media/0495d72f-ccd8-41de-aa9b-93bc3eaf63be/7799e019-11d8-4e6b-9107-35a0a3149abc/0ea6ef271844d4686a002e36969884b4-2024-11-GeorgeSchool-01alt-small.jpg",
  "creator": {
    "@type": "Organization",
    "name": "Keast & Hood"
  }
}
```